History

한국유량계공업은 30년간 축적된 노하우를 바탕으로 차별화된 시스템의 유량계 토탈 솔루션을 제공합니다.
2018
  • 12Acquired Explosion Proof and IP Safety Certification for Coriolis Mass Flowmeter
2017
  • 04KOLAS expanded the approval range of international calibration laboratory (fluid flow to gas)
2016
  • 05Completed and transferred to the 3rd factory (32-9 Wonchang-ro, Seo-gu, Incheon)
    Designated as INNO-BIZ by Small and Medium Business Administration
    Designated as a business for alternative military service
  • 02Institute was approved (Korean Industrial Technology Association)
2015
  • 09Developed and produced roots flowmeter
  • 07Acquired the explosion proof certification for Vortex thermal mass flowmeter
2014
  • 11Developed and produced thermal gas mass flowmeter
  • 05Approved as international calibration laboratory by KOLAS (fluid flow - liquid)
2013
  • 04Completed and transferred to 2nd factory (38-1 Wonchang-ro 64-gil, Seo-gu, Incheon)
  • 01Produced new products; Venturi & Nozzle flowmeter
2011
  • 03Acquired the explosion proof certification (Electronic Flowmeter, Metal tube Flowmeter)
2009
  • 03Developed and produced the Displacement Flowmeter
2007
  • 08Established overseas branch of Kometer (Taiwan, Dalian/China)
2005
  • 05Developed and produced the Electrode magnetic Flowmeter
2004
  • 03Established overseas joint-venture of Kometer (Shanghai/China)
2002
  • 11Built and transferred to new head office and factory (Incheon)
1999
  • 05Acquired explosion proof safety certification (Metal tude/ Turbine flowmeter)
1998
  • 11Install additional oil test system
  • 10Expand and transferred to new head office and factory (Gunpo-si/Gyeonggi-do)
    Install additional gas and liquid test system
1996
  • 10Start export business
  • 08Localization development Metal tube Flowmeter
  • 05Localization development Turbine Flowmeter
1994
  • 07Registered as member of Korea International Trade Association (Membership No.: 1130820)
1991
  • 08Founded KOREA FLOWMETER Co., Ltd.
    Acquired the license of flowmeter manufacturing business according to the provisions of Article 4 of Weights and Measures Act.
    Completed localization of Purge / Rota / Orifice/ Sightglass